image
image
user-login
Patent search/

TURBINE AND ELECTRIC POWER GENERATION SYSTEM

Patent Search in India

  • tick

    Extensive patent search conducted by a registered patent agent

  • tick

    Patent search done by experts in under 48hrs

₹999

₹399

Talk to expert

TURBINE AND ELECTRIC POWER GENERATION SYSTEM

PCT NATIONAL PHASE APPLICATION

Published

date

Filed on 8 January 2015

Patent Information

Application ID72/KOLNP/2015
Date of Application08/01/2015

Documents

NameDate
72-KOLNP-2015-Correspondence to notify the Controller [13-01-2022(online)].pdf13/01/2022
72-KOLNP-2015-US(14)-HearingNotice-(HearingDate-18-01-2022).pdf16/12/2021
72-KOLNP-2015-CLAIMS [20-08-2019(online)].pdf20/08/2019
72-KOLNP-2015-COMPLETE SPECIFICATION [20-08-2019(online)].pdf20/08/2019
72-KOLNP-2015-CORRESPONDENCE [20-08-2019(online)].pdf20/08/2019
72-KOLNP-2015-FER_SER_REPLY [20-08-2019(online)].pdf20/08/2019
72-KOLNP-2015-OTHERS [20-08-2019(online)].pdf20/08/2019
72-KOLNP-2015-Verified English translation (MANDATORY) [08-08-2019(online)].pdf08/08/2019
72-KOLNP-2015-FER.pdf20/02/2019
72-KOLNP-2015-8(i)-Substitution-Change Of Applicant - Form 6 [19-11-2018(online)].pdf19/11/2018
72-KOLNP-2015-ASSIGNMENT DOCUMENTS [19-11-2018(online)].pdf19/11/2018
72-KOLNP-2015-PA [19-11-2018(online)].pdf19/11/2018
72-KOLNP-2015-(12-03-2015)-CORRESPONDENCE.pdf12/03/2015
72-KOLNP-2015-(12-03-2015)-PA.pdf12/03/2015
DW.pdf12/03/2015
F2.pdf12/03/2015
F3.pdf12/03/2015
F5.pdf12/03/2015
72-KOLNP-2015-(18-02-2015)-ANNEXURE TO FORM 3.pdf18/02/2015
72-KOLNP-2015-(18-02-2015)-CORRESPONDENCE.pdf18/02/2015
72-KOLNP-2015-(18-02-2015)-ENGLISH TRANSLATION.pdf18/02/2015
earn

Refer a friend