Consult an Expert
Trademark
Design Registration
Consult an Expert
Trademark
Copyright
Patent
Infringement
Design Registration
More
Consult an Expert
Consult an Expert
Trademark
Design Registration
Login
“SYSTEM AND METHOD FOR PREVENTING CONSTRUCTION COST OVERRUNS BY USING ARTIFICIAL INTELLIGENCE TECHNOLOGY”
Extensive patent search conducted by a registered patent agent
Patent search done by experts in under 48hrs
₹999
₹399
Abstract
Information
Inventors
Applicants
Specification
Documents
ORDINARY APPLICATION
Published
Filed on 31 March 2020
Patent Information
| Application ID | 202021014362 |
| Date of Application | 31/03/2020 |
Documents
| Name | Date |
|---|---|
| 202021014362-Proof of Right [29-11-2020(online)].pdf | 29/11/2020 |
| 202021014362-ORIGINAL UR 6(1A) FORM 26-010720.pdf | 03/07/2020 |
| Abstract1.jpg | 27/06/2020 |
| 202021014362-COMPLETE SPECIFICATION [31-03-2020(online)].pdf | 31/03/2020 |
| 202021014362-DRAWINGS [31-03-2020(online)].pdf | 31/03/2020 |
| 202021014362-EVIDENCE FOR REGISTRATION UNDER SSI [31-03-2020(online)].pdf | 31/03/2020 |
| 202021014362-EVIDENCE FOR REGISTRATION UNDER SSI(FORM-28) [31-03-2020(online)].pdf | 31/03/2020 |
| 202021014362-FIGURE OF ABSTRACT [31-03-2020(online)].jpg | 31/03/2020 |
| 202021014362-FORM 1 [31-03-2020(online)].pdf | 31/03/2020 |
| 202021014362-FORM FOR SMALL ENTITY(FORM-28) [31-03-2020(online)].pdf | 31/03/2020 |
| 202021014362-FORM FOR STARTUP [31-03-2020(online)].pdf | 31/03/2020 |
| 202021014362-POWER OF AUTHORITY [31-03-2020(online)].pdf | 31/03/2020 |
Refer a friend