Consult an Expert
Trademark
Design Registration
Consult an Expert
Trademark
Copyright
Patent
Infringement
Design Registration
More
Consult an Expert
Consult an Expert
Trademark
Design Registration
Login
INTEGRATED CABLE-STAYED BUILDING SYSTEM
Extensive patent search conducted by a registered patent agent
Patent search done by experts in under 48hrs
₹999
₹399
Abstract
Information
Inventors
Applicants
Specification
Documents
ORDINARY APPLICATION
Published
Filed on 6 November 2024
Abstract
ABSTRACT
An integrated cable-stayed building system (100), the system (100) comprising:
a plurality of vertical support elements; a series of horizontal elements connecting the vertical support elements; a plurality of cables arranged to support and stabilize the structure by distributing loads efficiently; wherein the cables are configured to provide structural flexibility and aesthetic appeal.
.
<
Patent Information
Application ID | 202411084834 |
Invention Field | ELECTRICAL |
Date of Application | 06/11/2024 |
Publication Number | 46/2024 |
Inventors
Name | Address | Country | Nationality |
---|---|---|---|
MILAN KUMAR | LOVELY PROFESSIONAL UNIVERSITY, JALANDHAR-DELHI, G.T. ROAD, PHAGWARA, PUNJAB (INDIA) -144411 | India | India |
SUMIT KUMAR SINHA | LOVELY PROFESSIONAL UNIVERSITY, JALANDHAR-DELHI, G.T. ROAD, PHAGWARA, PUNJAB (INDIA) -144411 | India | India |
SHAHBAZ AHMED | LOVELY PROFESSIONAL UNIVERSITY, JALANDHAR-DELHI, G.T. ROAD, PHAGWARA, PUNJAB (INDIA) -144411 | India | India |
NGURANG KANAM | LOVELY PROFESSIONAL UNIVERSITY, JALANDHAR-DELHI, G.T. ROAD, PHAGWARA, PUNJAB (INDIA) -144411 | India | India |
Dr. MRUNMAYEE MANJARI SAHOO | LOVELY PROFESSIONAL UNIVERSITY, JALANDHAR-DELHI, G.T. ROAD, PHAGWARA, PUNJAB (INDIA) -144411 | India | India |
Applicants
Name | Address | Country | Nationality |
---|---|---|---|
LOVELY PROFESSIONAL UNIVERSITY | JALANDHAR-DELHI, G.T. ROAD, PHAGWARA, PUNJAB (INDIA) -144411 | India | India |
Specification
Description:FIELD OF THE DISCLOSURE
[0001] This invention generally relates to a field of construction engineering and, in particular, to the design and analysis of a new kind of cable-stayed building, enhancing structural stability and aesthetic appeal through innovative cable arrangements and material use.
BACKGROUND
[0002] The subject matter discussed in the background section should not be assumed to be prior art merely as a result of its mention in the background section. Similarly, a problem mentioned in the background section or associated with the subject matter of the background section should not be assumed to have been previously recognized in the prior art. The subject matter in the background section merely represents different approaches, which in and of themselves may also correspond to implementations of the claimed technology.
[0003] Conventional high-rise building structures rely predominantly on vertical load-bearing elements such as columns and walls, which are connected by horizontal elements lik , Claims:1. An integrated cable-stayed building system (100), the system (100) comprising:
a plurality of vertical support elements;
a series of horizontal elements connecting the vertical support elements;
a plurality of cables arranged to support and stabilize the structure by distributing loads efficiently;
wherein the cables are configured to provide structural flexibility and aesthetic appeal.
2. The system (100) as claimed in claim 1, wherein the vertical support elements are constructed using reinforced concrete.
Documents
Name | Date |
---|---|
202411084834-COMPLETE SPECIFICATION [06-11-2024(online)].pdf | 06/11/2024 |
202411084834-DECLARATION OF INVENTORSHIP (FORM 5) [06-11-2024(online)].pdf | 06/11/2024 |
202411084834-DRAWINGS [06-11-2024(online)].pdf | 06/11/2024 |
202411084834-FIGURE OF ABSTRACT [06-11-2024(online)].pdf | 06/11/2024 |
202411084834-FORM 1 [06-11-2024(online)].pdf | 06/11/2024 |
202411084834-FORM-9 [06-11-2024(online)].pdf | 06/11/2024 |
202411084834-POWER OF AUTHORITY [06-11-2024(online)].pdf | 06/11/2024 |
202411084834-PROOF OF RIGHT [06-11-2024(online)].pdf | 06/11/2024 |
202411084834-REQUEST FOR EARLY PUBLICATION(FORM-9) [06-11-2024(online)].pdf | 06/11/2024 |
Talk To Experts
Calculators
Downloads
By continuing past this page, you agree to our Terms of Service,, Cookie Policy, Privacy Policy and Refund Policy © - Uber9 Business Process Services Private Limited. All rights reserved.
Uber9 Business Process Services Private Limited, CIN - U74900TN2014PTC098414, GSTIN - 33AABCU7650C1ZM, Registered Office Address - F-97, Newry Shreya Apartments Anna Nagar East, Chennai, Tamil Nadu 600102, India.
Please note that we are a facilitating platform enabling access to reliable professionals. We are not a law firm and do not provide legal services ourselves. The information on this website is for the purpose of knowledge only and should not be relied upon as legal advice or opinion.