Consult an Expert
Trademark
Design Registration
Consult an Expert
Trademark
Copyright
Patent
Infringement
Design Registration
More
Consult an Expert
Consult an Expert
Trademark
Design Registration
Login
CONSTRUCTION BUILDING INFORMATION MODELLING (BIM) APPLICATION FOR PRESTRESSED CEMENT CONCRETE PAVEMENT (PCCP) CONSTRUCTION
Extensive patent search conducted by a registered patent agent
Patent search done by experts in under 48hrs
₹999
₹399
Abstract
Information
Inventors
Applicants
Specification
Documents
ORDINARY APPLICATION
Published
Filed on 22 November 2024
Abstract
The invention relates to a Building Information Modelling (BIM) application specifically designed for the construction and lifecycle management of Prestressed Cement Concrete Pavement (PCCP). The BIM application integrates various tools to streamline the design, simulation, construction, and maintenance of PCCP projects. Key features include a 3D modeling engine for creating detailed parametric models, a material management system for optimizing material selection and cost estimation, and a prestressing simulation module that models stress distribution, tendon losses, and deflection behavior. Additionally, the application provides a load analysis tool for simulating dynamic and static traffic loads, along with a construction sequencing module for automated scheduling and real-time progress tracking. A cloud-based collaboration platform allows real-time communication between stakeholders, ensuring efficient project execution and timely updates. Post-construction, the application supports maintenance and lifecycle management, using predictive analytics to optimize maintenance schedules and costs. This innovative BIM solution simplifies the complex construction processes associated with PCCP, enhances collaboration, reduces errors, and ensures long-term pavement durability.
Patent Information
Application ID | 202441090949 |
Invention Field | COMPUTER SCIENCE |
Date of Application | 22/11/2024 |
Publication Number | 48/2024 |
Inventors
Name | Address | Country | Nationality |
---|---|---|---|
Nagaraj M Tattien | Civil Engineering Department, B V Raju Institute of Technology, Vishnupur, Narsapur, Medak, Telangana 502313 | India | India |
Dr. S Krishna Rao | Civil Engineering Department, B V Raju Institute of Technology, Vishnupur, Narsapur, Medak, Telangana 502313 | India | India |
Abhay M | Civil Engineering Department, B V Raju Institute of Technology, Vishnupur, Narsapur, Medak, Telangana 502313 | India | India |
S. J. Shivaraj | Civil Engineering Department, B V Raju Institute of Technology, Vishnupur, Narsapur, Medak, Telangana 502313 | India | India |
Manjunatha | Civil Engineering Department, B V Raju Institute of Technology, Vishnupur, Narsapur, Medak, Telangana 502313 | India | India |
S Kalappa | Civil Engineering Department, B V Raju Institute of Technology, Vishnupur, Narsapur, Medak, Telangana 502313 | India | India |
K Poojitha | Civil Engineering Department, B V Raju Institute of Technology, Vishnupur, Narsapur, Medak, Telangana 502313 | India | India |
Applicants
Name | Address | Country | Nationality |
---|---|---|---|
B V RAJU INSTITUTE OF TECHNOLOGY | Civil Engineering Department, B V Raju Institute of Technology, Vishnupur, Narsapur, Medak, Telangana 502313 | India | India |
Specification
Description:FIELD OF THE INVENTION: The present invention relates to the field of civil engineering, specifically to the construction of Prestressed Cement Concrete Pavements (PCCP). More particularly, the invention provides a Building Information Modelling (BIM) application designed to facilitate and optimize the design, construction, management, and maintenance of PCCP. he present invention pertains to the field of civil engineering and construction technology, specifically focusing on the application of Building Information Modelling (BIM) in the design, construction, and management of Prestressed Cement Concrete Pavement (PCCP) infrastructure. Prestressed Cement Concrete Pavements are widely used in infrastructure projects, including highways, airports, and industrial pavements, due to their superior load-bearing capacity, durability, and long service life. However, the complexity of prestressed concrete design, installation, and maintenance presents significant challenges that require innovative solutions for efficient project execution. Building Information Modelling (BIM) is an emerging technology that facilitates the digital representation of physical and functional characteristics of infrastructure assets throughout their lifecycle. Traditionally used in building design and vertical construction, BIM has now expanded into various infrastructure domains, allowing for improved project planning, collaboration, and decision-making. BIM integrates various dimensions-such as 3D models, scheduling (4D), cost management (5D), and maintenance tracking (6D)-into a single platform, promoting real-time communication and optimization across project stakeholders. In this context, the invention focuses on the adaptation of BIM technology specifically for PCCP construction. The invention provides a BIM application that is tailored to the unique requirements of prestressed Page 3 of 9 concrete pavements, addressing the intricacies of prestressing design, joint layout, material selection, reinforcement, curing processes, and long-term maintenance. By integrating advanced simulation, design, and collaboration tools, the proposed BIM application enhances the precision, efficiency, and quality of PCCP construction, while offering a streamlined solution for maintenance and lifecycle management. This field of invention aims to bridge the gap between traditional construction methodologies and advanced digital construction management technologies, bringing the benefits of BIM to large-scale horizontal infrastructure projects such as PCCP. This invention is particularly relevant in addressing the increasing demand for durable, high-performance pavement systems that can withstand heavy traffic loads and environmental stresses over extended periods, while reducing project delays, costs, and operational inefficiencies through digital innovation. BACKGROUND OF THE INVENTION: Prestressed Cement Concrete Pavement (PCCP) is widely used in the construction of highways, airports, and industrial pavements due to its strength, durability, and cost-effectiveness. However, the complexity involved in designing, constructing, and managing PCCP projects requires a comprehensive system that allows real-time collaboration between stakeholders and improved project outcomes. Building Information Modelling (BIM) has been adopted extensively in construction management for buildings and large-scale infrastructure projects. However, its application in the domain of PCCP construction has been limited. The lack of integrated tools to model, simulate, and manage the complexities of prestressing, material selection, reinforcement, joint design, and curing processes presents significant challenges. Therefore, there exists a need for a dedicated BIM solution tailored to the specific requirements of PCCP construction that ensures enhanced project planning, seamless collaboration, cost-efficiency, and effective long-term Page 4 of 9 management. Summary of the Invention: The present invention provides a Building Information Modelling (BIM) application specifically designed for Prestressed Cement Concrete Pavement (PCCP) construction. This BIM application integrates advanced modelling tools to simulate the prestressing of concrete, material analysis, joint design, load distribution, and construction sequencing. The BIM solution also allows real-time collaboration between project stakeholders, ensuring that design changes and project updates are communicated instantly to the entire team. The proposed BIM application provides the following functionalities: 1.3D Modelling: The application supports 3D models of PCCP, including detailed representations of prestressing tendons, reinforcement layouts, and joints. 2.Prestressing Simulation: It provides tools to simulate the behavior of prestressed concrete during and after construction, ensuring correct prestress levels and distribution. 3.Material Management: A database for the selection and management of materials, including concrete grades, reinforcements, and prestressing strands, is integrated into the system. 4.Construction Sequencing and Scheduling: The application supports detailed construction sequences, scheduling, and real-time progress tracking. 5.Load Analysis: It includes load analysis for different types of vehicles and traffic conditions, helping to optimize the pavement design. 6.Collaboration and Cloud Storage: The application supports real-time collaboration, allowing stakeholders to view, edit, and share models and data through cloud-based platforms. 7.Maintenance Management: After construction, the application provides tools for maintenance scheduling, tracking, and performance monitoring over the pavement's lifespan. Page 5 of 9 The BIM application simplifies complex PCCP construction processes, improves collaboration between project participants, and enhances the quality and longevity of the pavement. 1. Introduction: The present invention pertains to a Building Information Modelling (BIM) application specifically tailored for the design, construction, and lifecycle management of Prestressed Cement Concrete Pavements (PCCP). PCCP is a critical infrastructure component known for its durability and load-bearing capabilities, often utilized in high-traffic areas such as highways, bridges, and industrial facilities. The invention integrates advanced technologies to enhance the efficiency, reliability, and sustainability of PCCP projects. 2. System Architecture: The BIM application comprises a comprehensive system architecture designed to support various stages of PCCP construction: Modeling Engine: A sophisticated 3D modeling engine enables detailed parametric modeling of PCCP structures, including prestressing tendons, reinforcements, and joint layouts. Engineers can input design parameters such as dimensions, prestressing forces, and concrete properties, facilitating precise visualization and adjustment of design elements. Database Management System: Central to the application is a robust material database that houses essential information on concrete grades, reinforcing materials, prestressing strands, and other construction elements. This centralized repository ensures accurate material selection based on project-specific requirements, promoting efficiency and cost-effectiveness in material management. Simulation Tools: Advanced simulation tools simulate the behavior of prestressed concrete throughout the construction lifecycle. These tools analyze stress distribution, tensioning effects, joint performance, and Page 6 of 9 thermal expansion, providing engineers with real-time insights into structural performance under varying loads and environmental conditions. Scheduling Module: An interactive scheduling module facilitates the planning and monitoring of construction activities. It automates workflow processes, from formwork installation to post-tensioning operations, ensuring adherence to project timelines and minimizing construction delays. Collaboration Platform: Utilizing cloud-based technology, the application fosters real-time collaboration among project stakeholders, including engineers, contractors, and clients. This platform enables seamless communication, design modifications, and access to updated project data, enhancing project coordination and decision-making efficiency. 3. Application Interface: The BIM application features an intuitive user interface designed to optimize usability and functionality: Design Input Section: Engineers input project-specific parameters such as pavement thickness, prestressing levels, and anticipated traffic loads. This section serves as a centralized hub for design customization and optimization. Simulation View: Real-time simulation results, including stress distribution and joint movement, are displayed for comprehensive analysis and adjustment during the design phase. Construction Progress Tracking: Engineers and project managers can track the progress of each construction phase through the interface, ensuring transparency and accountability in project execution. 4. Real-Time Simulation Capabilities: The application supports advanced real-time simulation capabilities critical for optimizing PCCP design and performance: Load Distribution Simulations: Engineers can simulate and analyze the Page 7 of 9 impact of various vehicular loads on the pavement structure, optimizing design parameters to enhance durability and load-bearing capacity. Thermal Expansion and Contraction Analysis: Insights into concrete behavior under different temperature conditions enable engineers to design effective joint layouts and mitigate potential cracking or structural damage. 5. Construction Sequencing and Planning: The BIM application includes a comprehensive construction sequencing module essential for effective project management: Pre-Construction Planning: Detailed scheduling and sequencing of construction activities, including formwork placement, reinforcement installation, and prestressing operations, are automated to streamline workflow processes and minimize construction timeframes. Prestressing Operations Simulation: Engineers can simulate and optimize prestressing procedures, ensuring precise application of prestressing forces and minimizing material wastage during construction. 6. Maintenance and Lifecycle Management: Post-construction, the application supports maintenance and lifecycle management activities to preserve PCCP integrity and longevity: Maintenance Scheduling: A dedicated module tracks pavement performance and schedules maintenance activities such as crack sealing, joint repairs, and surface treatments based on real-time condition monitoring data. Lifecycle Management: Continuous monitoring and analysis of pavement conditions ensure proactive maintenance strategies, extending the service life of PCCP structures and optimizing lifecycle costs. 7. Conclusion: In conclusion, the BIM application for Prestressed Cement Concrete Page 8 of 9 Pavements (PCCP) presented herein represents a significant advancement in infrastructure construction technology. By integrating cutting-edge modeling, simulation, and collaboration tools, the invention enhances project efficiency, durability, and sustainability. This innovative solution is poised to revolutionize the construction industry, offering unprecedented capabilities in design optimization, real-time project management, and lifecycle maintenance of PCCP structures. , Claims:Claim 1: A Building Information Modelling (BIM) application for Prestressed Cement Concrete Pavement (PCCP) construction, comprising a tool for analyzing loads and simulating traffic patterns to optimize stress distribution and reinforcement design for enhanced durability. Claim 2: The BIM application of Claim 1, which automates construction workflows to efficiently schedule prestressing operations, material deliveries, and installations, thereby minimizing project delays. Claim 3: The BIM application of Claim 1, incorporating a cloud-based platform that facilitates real-time collaboration among stakeholders and provides remote access to construction information through a mobile interface. Claim 4: The BIM application of Claim 1, equipped with sensors for real-time monitoring of PCCP condition and predictive maintenance scheduling. Claim 5: The BIM application of Claim 1, featuring automated guidance for tendon tensioning to ensure precise prestressing operations. Claim 6: The BIM application of Claim 1, including a system that recommends sustainable materials based on performance and cost-effectiveness criteria, thereby promoting eco-friendly practices in construction.
Documents
Name | Date |
---|---|
202441090949-COMPLETE SPECIFICATION [22-11-2024(online)].pdf | 22/11/2024 |
202441090949-DECLARATION OF INVENTORSHIP (FORM 5) [22-11-2024(online)].pdf | 22/11/2024 |
202441090949-FORM 1 [22-11-2024(online)].pdf | 22/11/2024 |
202441090949-REQUEST FOR EARLY PUBLICATION(FORM-9) [22-11-2024(online)].pdf | 22/11/2024 |
Talk To Experts
Calculators
Downloads
By continuing past this page, you agree to our Terms of Service,, Cookie Policy, Privacy Policy and Refund Policy © - Uber9 Business Process Services Private Limited. All rights reserved.
Uber9 Business Process Services Private Limited, CIN - U74900TN2014PTC098414, GSTIN - 33AABCU7650C1ZM, Registered Office Address - F-97, Newry Shreya Apartments Anna Nagar East, Chennai, Tamil Nadu 600102, India.
Please note that we are a facilitating platform enabling access to reliable professionals. We are not a law firm and do not provide legal services ourselves. The information on this website is for the purpose of knowledge only and should not be relied upon as legal advice or opinion.