image
image
user-login
Patent search/

A WIND TURBINE TOWER GUIDE SYSTEM AND A METHOD FOR INSTALLING AN INSTALLATION UNIT

Patent Search in India

  • tick

    Extensive patent search conducted by a registered patent agent

  • tick

    Patent search done by experts in under 48hrs

₹999

₹399

Talk to expert

A WIND TURBINE TOWER GUIDE SYSTEM AND A METHOD FOR INSTALLING AN INSTALLATION UNIT

PCT NATIONAL PHASE APPLICATION

Published

date

Filed on 18 June 2015

Patent Information

Application ID3548/CHENP/2015
Date of Application18/06/2015

Documents

NameDate
3548-CHENP-2015-RELEVANT DOCUMENTS [14-09-2023(online)].pdf14/09/2023
3548-CHENP-2015-PatentCertificate22-10-2021.pdf22/10/2021
3548-CHENP-2015-ABSTRACT [15-10-2019(online)].pdf15/10/2019
3548-CHENP-2015-CLAIMS [15-10-2019(online)].pdf15/10/2019
3548-CHENP-2015-COMPLETE SPECIFICATION [15-10-2019(online)].pdf15/10/2019
3548-CHENP-2015-DRAWING [15-10-2019(online)].pdf15/10/2019
3548-CHENP-2015-FER_SER_REPLY [15-10-2019(online)].pdf15/10/2019
3548-CHENP-2015-FORM 3 [15-10-2019(online)].pdf15/10/2019
3548-CHENP-2015-Information under section 8(2) (MANDATORY) [15-10-2019(online)].pdf15/10/2019
3548-CHENP-2015-OTHERS [15-10-2019(online)].pdf15/10/2019
3548-CHENP-2015-FER.pdf22/08/2019
Form-18(Online).pdf23/11/2016
Form 18 [22-11-2016(online)].pdf22/11/2016
3548-CHENP-2015-Correspondence-101215.pdf08/06/2016
3548-CHENP-2015-Form 1-101215.pdf08/06/2016
3548-CHENP-2015-Form 3-101215.pdf08/06/2016
3548-CHENP-2015-Power of Attorney-101215.pdf08/06/2016
abstract 3548-CHENP-2015.jpg14/07/2015
CLAIMS.pdf24/06/2015
FORM-3.pdf24/06/2015
FORM-5.pdf24/06/2015
OTHERS.pdf24/06/2015
3548-CHENP-2015.pdf19/06/2015
earn

Refer a friend