A SYSTEM FOR PROVIDING THE FRAMEWORK OF PROJECT MANAGEMENT FOR DEVELOPING CONSTRUCTION SERVICE AND METHOD THEREOF
Extensive patent search conducted by a registered patent agent
Patent search done by experts in under 48hrs
₹999
₹399
Abstract
Information
Inventors
Applicants
Specification
Documents
ORDINARY APPLICATION
Published
Filed on 23 November 2024
Abstract
A system for providing a framework for project management in construction services, comprising interconnected modules for planning, procurement, task scheduling, resource allocation, risk management, quality assurance, and enhanced communication. The invention utilizes a centralized cloud-based platform integrated with AI tools for predictive analysis, dynamic scheduling, IoT-enabled real-time monitoring, and real-time collaboration, enhancing the efficiency, transparency, and overall success of construction projects. The planning module uses advanced algorithms to generate optimized schedules based on resource availability, historical data, and project constraints, allowing for adaptive planning in response to real-time changes on-site.
Patent Information
Application ID | 202411091253 |
Invention Field | COMPUTER SCIENCE |
Date of Application | 23/11/2024 |
Publication Number | 49/2024 |
Inventors
Name | Address | Country | Nationality |
---|---|---|---|
Dr. Akhilesh Verma | Professor, Computer Science and Engineering, Ajay Kumar Garg Engineering College, 27th KM Milestone, Delhi - Meerut Expy, Ghaziabad, Uttar Pradesh 201015, India. | India | India |
Drishti Gupta | Department of Computer Science and Engineering, Ajay Kumar Garg Engineering College, 27th KM Milestone, Delhi - Meerut Expy, Ghaziabad, Uttar Pradesh 201015, India. | India | India |
Applicants
Name | Address | Country | Nationality |
---|---|---|---|
Ajay Kumar Garg Engineering College | 27th KM Milestone, Delhi - Meerut Expy, Ghaziabad, Uttar Pradesh 201015 | India | India |
Specification
Description:[013] The following sections of this article will provide various embodiments of the current invention with references to the accompanying drawings, whereby the reference numbers utilised in the picture correspond to like elements throughout the description. However, this invention is not limited to the embodiment described here and may be embodied in several other ways. Instead, the embodiment is included to ensure that this disclosure is extensive and complete and that individuals of ordinary skill in the art are properly informed of the extent of the invention. Numerical values and ranges are given for many parts of the implementations discussed in the following thorough discussion. These numbers and ranges are merely to be used as examples and are not meant to restrict the claims' applicability. A variety of materials are also recognised as fitting for certain aspects of the implementations. These materials should only be used as examples and are not meant to restrict the application of the innovation.
[014] Referring now to the drawings, these are illustrated in FIG. 1, the system for providing the framework of project management for developing construction services includes the following components:
Centralized Platform: A cloud-based, centralized platform for storing and accessing all construction project data, documents, and progress reports. It serves as the main hub for managing various aspects of construction projects, accessible by authorized personnel. The platform is built on scalable cloud infrastructure, allowing for secure and efficient data storage, backup, and retrieval. It includes role-based access control to ensure data privacy and security. The platform supports integration with third-party tools and offers APIs for custom development.
[015] In accordance with another embodiment of the present invention, AI-Based Analytics Module: This module includes machine learning algorithms to predict potential project risks, resource allocation conflicts, and schedule delays. Predictive models are used to provide insights into the most efficient pathways for project completion based on historical data. The AI module includes a neural network-based prediction engine that continuously learns from project data to improve its accuracy. Features include anomaly detection for cost overruns, schedule deviation alerts, and resource optimization recommendations.
[016] In accordance with another embodiment of the present invention, Task Scheduling and Resource Allocation module enables dynamic scheduling of tasks and automated resource allocation based on project timelines, availability of manpower, and equipment needs. The system ensures that resources are allocated efficiently and are re-distributed in case of unexpected changes. It features a Gantt chart interface for visualizing project schedules, a drag-and-drop scheduler for ease of use, and a resource leveling tool to balance workload across teams. The module supports integration with labor management systems to track worker availability and skills.
[017] In accordance with another embodiment of the present invention, Procurement Management Module: This module handles material procurement, vendor management, and supplier communications. It enables the timely procurement of construction materials, reducing project delays and ensuring quality standards are met. The module includes a supplier management system with a vendor rating mechanism, automated purchase order generation, inventory tracking, and integration with ERP systems for financial management. It also supports e-tendering and supplier contract management to streamline procurement processes as illustrated in figure 2.
[018] In accordance with another embodiment of the present invention, A risk assessment module integrated with AI tools that can identify potential risks early and provide mitigation strategies. The module continuously analyzes project parameters such as cost overruns, labor availability, weather forecasts, and regulatory requirements. It features a risk matrix to visualize and prioritize risks, scenario analysis tools for assessing the impact of potential risks, and automated mitigation plan suggestions. The risk management module also includes a dashboard for tracking identified risks and their status in real-time.
[019] Quality Assurance Module ensures quality standards are maintained by enabling automated quality checks during the different phases of the project. The module allows project managers to set quality benchmarks and track compliance. It includes features such as checklists for quality inspections, integration with IoT sensors for real-time quality data collection, and an automated reporting system for non-conformance incidents. The module also provides statistical process control (SPC) charts to monitor quality metrics and identify areas for improvement.
[020] Progress Tracking and Reporting includes real-time progress tracking through sensors and IoT devices on construction sites. It generates detailed progress reports that can be shared with clients and stakeholders, ensuring transparency and accountability. The progress tracking module uses IoT-enabled devices to monitor equipment usage, worker attendance, and material consumption. The system also includes drone-based site monitoring for aerial progress tracking and 3D modeling to compare actual progress against planned milestones. Reports are generated automatically and can be customized to suit the needs of different stakeholders.
The method of utilizing the project management framework includes the following steps:
Initiation and Planning: Creating a digital blueprint for the construction project, including timelines, budget, resources, and risk assessment. The planning phase uses AI-based tools to generate optimized schedules and resource plans. It also includes stakeholder analysis and goal setting to ensure alignment across the project team.
Resource and Schedule Allocation: Allocating labor, machinery, and materials efficiently, with AI optimization for reducing idle times and conflicts. The system dynamically adjusts the schedule based on real-time data from the construction site, ensuring optimal utilization of resources. It includes tools for workload balancing, shift scheduling, and resource forecasting.
Implementation and Monitoring: Continuous monitoring of on-site activities through the centralized platform, and using IoT-based sensors to gather real-time data for progress and safety compliance. The monitoring system includes safety alerts, equipment maintenance reminders, and real-time video feeds for site supervision. It also uses wearable devices to track worker health and safety metrics, ensuring compliance with safety regulations.
Risk Mitigation: Identification of potential risks through predictive analytics and implementing corrective measures in a timely manner. The system provides real-time alerts for emerging risks and suggests mitigation strategies. It includes a risk heat map to visualize risk severity and likelihood, and an automated incident reporting tool for immediate response.
Quality Assurance and Reporting: Automated quality checks at each phase and detailed reporting for stakeholders, providing a transparent overview of project performance. Quality assurance includes IoT-based monitoring for material quality, automated defect detection using computer vision, and compliance tracking against industry standards. Reports are generated in real-time and can be shared via the centralized platform or exported in various formats.
[021] The system integrates all phases of a construction project, improving efficiency and reducing redundancy. AI modules provide predictive insights into potential risks and resource optimization, minimizing project delays. Real-time communication and centralized information access improve coordination among stakeholders, reducing misunderstandings and project downtime. The cloud-based platform is scalable, allowing it to handle projects of varying sizes, and incorporates advanced security features such as end-to-end encryption and multi-factor authentication. IoT integration and real-time analytics provide actionable insights, enhancing decision-making and project transparency.
[022] The benefits and advantages that the present invention may offer have been discussed above with reference to particular embodiments. These benefits and advantages are not to be interpreted as critical, necessary, or essential features of any or all of the embodiments, nor are they to be read as any elements or constraints that might contribute to their occurring or becoming more evident.
[023] Although specific embodiments have been used to describe the current invention, it should be recognized that these embodiments are merely illustrative and that the invention is not limited to them. The aforementioned embodiments are open to numerous alterations, additions, and improvements. These adaptations, changes, additions, and enhancements are considered to be within the purview of the invention. , Claims:1. A system for providing a project management framework for developing construction services, comprising:
a cloud-based centralized platform configured to store and access all construction project data, documents, and progress reports;
an AI-based analytics module comprising machine learning algorithms to predict potential project risks, resource allocation conflicts, and schedule delays;
a task scheduling and resource allocation module configured to enable dynamic scheduling of tasks and automated resource allocation based on project timelines, manpower availability, and equipment needs;
a procurement management module configured to manage material procurement, vendor management, and supplier communications;
a risk management module integrated with AI tools to identify potential project risks early and provide mitigation strategies;
a communication and collaboration module configured to provide an integrated communication platform for project stakeholders;
a quality assurance module configured to ensure quality standards are maintained throughout different project phases;
a progress tracking and reporting module configured to provide real-time progress tracking through sensors and IoT devices;
wherein the module includes drone-based site monitoring for aerial progress tracking, 3D modeling to compare actual progress against planned milestones, and automated report generation.
2. The system as claimed in claim 1, wherein the centralized platform is built on a scalable cloud infrastructure that provides secure data storage, backup, and retrieval, and incorporates advanced security features, including end-to-end encryption and multi-factor authentication.
3. The system as claimed in claim 1, wherein the AI-based analytics module includes a neural network-based prediction engine that continuously learns from historical project data to improve its prediction accuracy over time.
4. The system as claimed in claim 1, wherein the task scheduling and resource allocation module is configured to redistribute resources in case of unexpected changes, and further includes a resource leveling tool for workload balancing across teams.
5. The system as claimed in claim 1, wherein the procurement management module is further configured to integrate with enterprise resource planning (ERP) systems for financial management, and includes features for automated purchase order generation and inventory tracking.
6. The system as claimed in claim 1, wherein the risk management module includes scenario analysis tools for assessing the impact of potential risks and an automated mitigation plan suggestion system to proactively address identified risks.
7. The system as claimed in claim 1, wherein the communication and collaboration module includes threaded discussions, file version control, task assignment with built-in reminders, and a mobile application for on-site teams to access project information and communicate instantly.
8. The system as claimed in claim 1, wherein the quality assurance module includes statistical process control (SPC) charts to monitor quality metrics and identify areas for improvement, and further integrates IoT sensors for real-time quality data collection.
9. The system as claimed in claim 1, wherein the progress tracking and reporting module uses IoT-enabled devices to monitor equipment usage, worker attendance, and material consumption, and further includes drone-based site monitoring for aerial progress tracking.
10. A method for utilizing the project management framework of claim 1, comprising:
a) creating a digital blueprint for the construction project, including timelines, budget, resources, and risk assessment using AI-based tools;
b) allocating labor, machinery, and materials efficiently with AI optimization, and dynamically adjusting schedules based on real-time site data;
c) continuously monitoring on-site activities through the centralized platform and gathering real-time data for progress and safety compliance using IoT-based sensors;
d) identifying potential risks through predictive analytics and implementing corrective measures using real-time alerts and mitigation strategies;
e) performing automated quality checks at each project phase and generating detailed quality reports for stakeholders, including compliance tracking and defect detection.
Documents
Name | Date |
---|---|
202411091253-COMPLETE SPECIFICATION [23-11-2024(online)].pdf | 23/11/2024 |
202411091253-DECLARATION OF INVENTORSHIP (FORM 5) [23-11-2024(online)].pdf | 23/11/2024 |
202411091253-DRAWINGS [23-11-2024(online)].pdf | 23/11/2024 |
202411091253-EDUCATIONAL INSTITUTION(S) [23-11-2024(online)].pdf | 23/11/2024 |
202411091253-EVIDENCE FOR REGISTRATION UNDER SSI [23-11-2024(online)].pdf | 23/11/2024 |
202411091253-EVIDENCE FOR REGISTRATION UNDER SSI(FORM-28) [23-11-2024(online)].pdf | 23/11/2024 |
202411091253-FORM 1 [23-11-2024(online)].pdf | 23/11/2024 |
202411091253-FORM 18 [23-11-2024(online)].pdf | 23/11/2024 |
202411091253-FORM FOR SMALL ENTITY(FORM-28) [23-11-2024(online)].pdf | 23/11/2024 |
202411091253-FORM-9 [23-11-2024(online)].pdf | 23/11/2024 |
202411091253-REQUEST FOR EARLY PUBLICATION(FORM-9) [23-11-2024(online)].pdf | 23/11/2024 |
202411091253-REQUEST FOR EXAMINATION (FORM-18) [23-11-2024(online)].pdf | 23/11/2024 |
Talk To Experts
Calculators
Downloads
By continuing past this page, you agree to our Terms of Service,, Cookie Policy, Privacy Policy and Refund Policy © - Uber9 Business Process Services Private Limited. All rights reserved.
Uber9 Business Process Services Private Limited, CIN - U74900TN2014PTC098414, GSTIN - 33AABCU7650C1ZM, Registered Office Address - F-97, Newry Shreya Apartments Anna Nagar East, Chennai, Tamil Nadu 600102, India.
Please note that we are a facilitating platform enabling access to reliable professionals. We are not a law firm and do not provide legal services ourselves. The information on this website is for the purpose of knowledge only and should not be relied upon as legal advice or opinion.